Power and time belong in the same plan.

Connect operating hours with an explicit electricity boundary, without treating TDP as metered demand.

Original analysis · 8 November 2026

Start at the boundary

A GPU power rating is not a facility electricity bill. CPUs, memory, storage, network devices and cooling also consume energy. A planning estimate needs an average operating draw, a period and a boundary for shared equipment. Power usage effectiveness relates facility energy to IT energy over a consistent scope and period.

Do not multiply uncertainty into certainty

Our Capacity & Energy model adds user-entered average GPU power and allocated host power, multiplies by scheduled GPU-hours and then by PUE. The result is a simple facility allocation. It excludes embodied emissions, construction, peak electrical design and off-schedule idle consumption. It does not establish grid access or a connection date.

Industry context is different from project sizing

The IEA’s 2026 report examines fast-growing data-center electricity use and infrastructure constraints. Its estimates are global research context. A specific deployment still needs local utility evidence, capacity reservation, cooling design and a credible delivery sequence. A global demand chart cannot provide those answers.

Use the result to ask a better question

Keep average draw separate from peak provisioning. Request the site’s operating envelope and measurement method, then test an hour, a representative day and a longer period. Avoid counting electricity twice in a cloud quotation that already includes it. Our Deployment Compare tool displays the owned-energy component separately from a supplied cloud rate.

Official references: I1, N3. Checked 8 November 2026. Company descriptions remain attributed; announced plans retain their conditions.