Average energy and peak design
Energy is power integrated over time. Average operating draw is appropriate for a scenario; peak electrical capacity and cooling design require a different engineering boundary. Do not infer a connection size from a simple utilisation percentage.
Shared overhead
Host components, networking, storage and cooling sit around the accelerators. Our model exposes an allocation for host power and a PUE assumption so those costs are visible. It does not produce a facility engineering design or guarantee an electricity tariff.
Time to usable infrastructure
Power availability, prepared cooling and commissioning can determine when compute becomes useful. Modular assembly may change part of that sequence while leaving site dependencies intact. Confirm the actual delivery and handover responsibilities before scheduling a workload.